McCULLOUGH-HYDE MEMORIAL HOSPITAL, Oxford, Ohio
Facility Expansion and Renovation

The project included a 50,000 SF addition and renovation of the existing 35,000 SF hospital.

Benefits:
The hospital remained fully operational during the construction period.  Installation of an expensive redundant electric feeder from the utility company was avoided by adding a generator and uninterruptible power system.

Type of Services:

  • Rotary UPS system for continuous power
  • New central boiler and chiller plant systems mated with existing plants
  • Turnkey 1,250 kW emergency generator for 100% back-up, paralleled with local utility