CINERGY SOLUTIONS, Cincinnati, Ohio
Downtown Cincinnati District CHW System

The 15,000 ton plant serves a dozen large downtown Cincinnati facilities, including the Cincinnati Convention Center, Paul Brown Stadium, Federal Courthouse, two hotels, and several high-rise office towers.

Benefits:
Based on the system concepts and redundancy designed into the plant, only 4 hours of downtime occurred with no end-user impact during the first seven years of operation.

One of the first variable-primary chilled-water pumping systems in the country.

Type of Services:

  • Analyzed several candidate sites, ultimately fitting the plant in the basement of an existing building 
  • Design of the plant, including eight 1,875-ton electric chillers in series/counterflow arrangement, free-cooling heat exchanger for winter operation, 4,160-V and 480-V spot networks served from ten 13.2-kV service-entrance switches
  • Fault-current and short-circuit-coordination study using  modeling and network design software 
  • Networked digital control system, fiber optic connection to customer sites, monitoring and billing software, innovative control sequences
  • Life-cycle cost and technical evaluation for connecting 25 individual buildings to the CHW loop using custom-designed analysis software
  • Over 5,000 trench feet of 18-24" street and building piping and fiber optic cabling
  • Design of all customer connections and in-building interface modifications