Facility and Utility Systems - Analysis/Design/Construction

Project Profiles

Project Profiles

Bulk Ingredient Storage

ThermalTech Engineering has partnered with one of our Mid-Atlantic customers to provide Utilities Engineering, Project Management, and Construction Management for a new bulk ingredient storage system. Pre-construction services included: site master planning, cost opinions, and bidding services. ThermalTech and our subconsultants provided Utility Engineering, Process Design, Architectural Design, and Structural Engineering for the installation of […]

Hot Water Boiler Replacement

A Mid-Atlantic candy manufacturer, relying heavily on hot water generation for building heat and process requirements, turned to ThermalTech Engineering for engineering and construction management for the replacement their failing hot water boilers. During design, ThermalTech identified inefficiencies in the system that resulted in increased pumping horsepower and decreased boiler effectiveness. We were able to […]

Biogas Reclamation

A large fruit-juice-based beverage manufacturer built a water treatment facility in 2001 for processing waste products from its manufacturing processes. One of the main components of the waste is methane, a byproduct produced from processing sugar and other natural materials. The client was generating an average of 123,000 cubic feet of methane daily, with approximately […]

Hamilton County Juvenile Court – LEED EB+OM Certification

Recently, the Hamilton County Juvenile Court facility, the former Times Star Building, located at 800 Broadway Avenue in downtown Cincinnati, was the first government building in Cincinnati, and one of the first three in the State of Ohio, to receive Certification in the LEED’s Existing Building: Operations and Maintenance (EB+OM) program. The nineteen story, 355,000 […]

Rooftop Air Handler Replacement

ThermalTech Engineering provided engineering and construction phase services to Duke Energy for the replacement of the main air handing unit serving 75% of their office tower at the historic 4th and Main building.  The replacement unit is a variable capacity 90,000 CFM unit manufactured by Governair, using fan wall technology, built-in component redundancy and a conditioned […]

Paul Brown Stadium Scoreboards

Hamilton County, in Ohio, is the Owner of Paul Brown Stadium, home of the Cincinnati Bengals.  ThermalTech Engineering provided engineering and project management to the County for the replacement of 1999 vintage standard definition scoreboards, cameras, and control room (various upgrades over 10 years) with high definition systems. Significant increase in display area and production […]

MadTree Brewing

ThermalTech Engineering has worked as MadTree’s engineering partner since it’s initial planning in 2012.   A new facility located in the Oakley neighborhood of Cincinnati broke ground in July of 2016 and began production in the spring of 2017 on a new 100 BBL brewhouse provided by W.M. Sprinkman. A 15 BBL pilot brewhouse was […]

Cooling Tower Replacement

A local chemical manufacturing plant faced process cooling issues related to dilapidated 30-year-old cooling towers. Our ThermalTech engineers studied a variety of options and selected the best replacement solution.  We prepared a detailed design package, including a 3D model with thorough plans and sections of the installation. The new towers are two-cell, counterflow, induced draft […]